Portfolio Background
Elite Case Studies

Our Completed Projects

Real problems. Scientific thermodynamic dry-out procedures. Flawless Farrow & Ball redecorating. Filter and review our active London contracts.

Service Scope:
Borough Area:
Select Project Case Study
Barnsbury, Islington N1

Full Refurbishment of a Victorian Terrace

House Refurbishment
Duration: 17 WeeksView Breakdown & Slider →
Emergency Restore
Kensington W8

Ceiling Leak Trace and Full Reinstatement

Leak Damage Repair & Reinstatement
Duration: 12 DaysView Breakdown & Slider →
Pimlico, Westminster SW1V

Two-Bedroom Flat Refurbishment in a Mansion Block

Flat Refurbishment
Duration: 6 WeeksView Breakdown & Slider →
Chelsea SW3

Wet-Room Style Bathroom Refurbishment

Bathroom Refurbishment
Duration: 3 WeeksView Breakdown & Slider →
Active Contract InspectionClient: Private homeowners

Full Refurbishment of a Victorian Terrace

Full Refurbishment of a Victorian Terrace Comparison Slider - Restored After
Apex Restored
Full Refurbishment of a Victorian Terrace Comparison Slider - Damage Before
Damp / Damage Before
Full Refurbishment of a Victorian Terrace Comparison Slider
Slide handle left-to-right to inspect work
The Structural Challenge / Damage
  • Four-storey Victorian terrace untouched since the 1980s, with original lead pipework and a failing consumer unit.
  • Sagging lath-and-plaster ceilings and extensive damp staining to the rear elevation.
  • Cramped lower-ground kitchen disconnected from the garden and dining space.
Our Solution & Finishing Works
  • Full strip-out, rewire and replumb with new heating system and megaflo cylinder.
  • Structural opening between kitchen and dining room with steel installed, plus repaired lath ceilings and restored cornicing.
  • New hand-painted kitchen, two new bathrooms, and decoration throughout in a Little Greene scheme.
Project Specifications & Key Metrics
Duration Frame17 Weeks
Total Budget£287,000
Quality OutcomeZero defects at 12-month inspection